Diversion Wind Energy LLC
Baylor County, Texas · EIA plant ID 67601 · Operator: Southwestern Electric Power Co
Nameplate201MWSummer 201 MW
Generators2in service
Net generation738GWh12 mo to Jan 2026
Capacity factor42%wind units, summer MW
Heat rate—thermal plants only
First online2024
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2024 | 43.1 | 28.9% | — |
| 2025 | 726.7 | 41.3% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| DIV01 | Onshore Wind Turbine | WT | 98.6 | 98.6 | Dec 2024 | Operating | — | ge 3.4-140 |
| DIV02 | Onshore Wind Turbine | WT | 102 | 102 | Dec 2024 | Operating | — | ge 3.4-140 |
Owner / operator
Operator: Southwestern Electric Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Southwestern Electric Power Co | 100.0% | 201 MW |
Nearby plants
Within 80 km.
| Western Trail Wind, LLC | 367 MW | 15.3 km |
| Seymour Hills Wind Project, LLC | 30 MW | 22.2 km |
| Green Pastures Wind I | 150 MW | 37.3 km |
| Short Creek Solar | — | 39 km |
| Hutcherson Solar | — | 40.7 km |
| Red Hollow Renewable Energy | — | 41.7 km |