← Back to map

Diversion Wind Energy LLC

Baylor County, Texas · EIA plant ID 67601 · Operator: Southwestern Electric Power Co
WindOnshore Wind TurbineSPPBA: SWPP
Nameplate201MWSummer 201 MW
Generators2in service
Net generation738GWh12 mo to Jan 2026
Capacity factor42%wind units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%20242025202642.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202443.128.9%—
2025726.741.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
DIV01Onshore Wind TurbineWT98.698.6Dec 2024Operating—ge 3.4-140
DIV02Onshore Wind TurbineWT102102Dec 2024Operating—ge 3.4-140

Owner / operator

Operator: Southwestern Electric Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Southwestern Electric Power Co100.0%201 MW

Nearby plants

Within 80 km.
Western Trail Wind, LLC367 MW15.3 km
Seymour Hills Wind Project, LLC30 MW22.2 km
Green Pastures Wind I150 MW37.3 km
Short Creek Solar—39 km
Hutcherson Solar—40.7 km
Red Hollow Renewable Energy—41.7 km