Hutcherson SolarPlanned
Wilbarger County, Texas · EIA plant ID 68765 · Operator: Greenalia Solar Power Hutcherson, LLC
123 MW planned (Solar Photovoltaic), first expected Jan 2030 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| HUGSP | Solar Photovoltaic | PV | 123.3 | 123.3 | planned Jan 2030 | Planned | — | coming soon |
Owner / operator
Operator: Greenalia Solar Power Hutcherson, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Lockett Windfarm | 184 MW | 5.2 km |
| Oklaunion | retired | 10.5 km |
| Electra Wind Farm | 230 MW | 16.1 km |
| Western Trail Wind, LLC | 367 MW | 26.7 km |
| Blue Summit II Wind, LLC | 99 MW | 29.7 km |
| Blue Summit II Storage | 150 MW | 31.1 km |