East Road Storage ProjectPlanned

Mendocino County, California · EIA plant ID 67565 · Operator: Form Energy Inc.
BatteryCAISOBA: CISO

1 MW planned (Batteries), first expected Jun 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CEC01BatteriesBA11planned Jun 2027Planned—coming soon

Owner / operator

Operator: Form Energy Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Lake Mendocino4 MW5.9 km
Redemeyer Road Solar8 MW7.5 km
Potter Valley9 MW13.7 km
Kama 1 LLC2 MW29.9 km
Aidlin Geothermal Power Plant25 MW53.7 km
Cloverdale Solar I2 MW55.2 km