← Back to map

Cloverdale Solar I

Sonoma County, California · EIA plant ID 58949 · Operator: Altus Power America Management, LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor11%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201420162018202020222024202611.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20141.317.4%—
20152.921.8%—
20162.217.0%—
20172.519.1%—
20182.619.9%—
20192.115.6%—
20200.11.0%—
20210.75.6%—
202200.0%—
20231.611.9%—
20242.216.7%—
20251.511.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
TBDSolar PhotovoltaicPV1.51.5Jun 2014Operating—coming soon

Owner / operator

Operator: Altus Power America Management, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Altus Power America Management, LLC100.0%2 MW

Nearby plants

Within 80 km.
Cloverdale Solar Center1 MW0.5 km
ASTI1 MW3.9 km
Warm Springs Hydro Project3 MW5.7 km
Aidlin Geothermal Power Plant25 MW13.6 km
Bottle Rock Power55 MW22.7 km
Sonoma California Geothermal78 MW22.8 km