Nortera Customer Hosted Solar
Fond du Lac County, Wisconsin · EIA plant ID 67539 · Operator: Wisconsin Power & Light Co
Nameplate2MWSummer 2 MW
Generators1in service
Net generation0GWh12 mo to Dec 2025
Capacity factor5%solar units, summer MW
Heat rate—thermal plants only
First online2025
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2025 | 0.3 | 5.2% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| PV1 | Solar Photovoltaic | PV | 1.6 | 1.6 | Aug 2025 | Operating | — | coming soon |
Owner / operator
Operator: Wisconsin Power & Light Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Wisconsin Power & Light Co | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Waupun Correctional Central Heating Plt | 4 MW | 16.5 km |
| Berlin Landfill Gas | 2 MW | 25.3 km |
| Beaver Dam Solar | 50 MW | 27.7 km |
| South Fond Du Lac | 382 MW | 29.4 km |
| Glacier Hills | 162 MW | 29.9 km |
| ENGIE 2020 ProjectCo-WI1 LLC | 1 MW | 31.2 km |