ENGIE 2020 ProjectCo-WI1 LLC
Fond Du Lac County, Wisconsin · EIA plant ID 65659 · Operator: engie 2020 projectco-wi1 llc
Nameplate1MWSummer 1 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2021
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2021 | 0 | 0.0% | — |
| 2022 | 3.2 | 36.2% | — |
| 2023 | 3.4 | 38.8% | — |
| 2024 | 2.1 | 23.6% | — |
| 2025 | 1.7 | 19.8% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| PV1 | Solar Photovoltaic | PV | 1 | 1 | Dec 2021 | Operating | — | coming soon |
Owner / operator
Operator: engie 2020 projectco-wi1 llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Project Comapny FinCo Phase V LLC | 100.0% | 1 MW |
Nearby plants
Within 80 km.
| Fond du Lac Community Solar | 1 MW | 0.1 km |
| South Fond Du Lac | 382 MW | 1.8 km |
| Ledgeview | 5 MW | 11.4 km |
| Cedar Ridge | 68 MW | 12.5 km |
| Forward Wind Energy Center | 129 MW | 13.4 km |
| Springfield Solar (WI) | 100 MW | 14.8 km |