← Back to map

UADA

Howard County, Arkansas · EIA plant ID 67526 · Operator: Entegrity Solar UA AG, LLC
SolarSolar PhotovoltaicSPPBA: SWPP
Nameplate3MWSummer 3 MW
Generators1in service
Net generation6GWh12 mo to Dec 2025
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2023

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202320242025202623.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202300.0%—
20245.923.9%—
20255.723.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
62293Solar PhotovoltaicPV2.82.8May 2023Operating—coming soon

Owner / operator

Operator: Entegrity Solar UA AG, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Entegrity Solar UA AG, LLC100.0%3 MW

Nearby plants

Within 80 km.
ACC2 MW0.1 km
Narrows (AR)26 MW28 km
John W Turk Jr Power Plant609 MW31.1 km
Fulton (AR)155 MW35.8 km
Ashdown157 MW39.2 km
Southwest Arkansas Electric1 MW48 km