ACC
Howard County, Arkansas · EIA plant ID 67507 · Operator: Entegrity Solar ACC, LLC
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2023
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2023 | 0 | 0.0% | — |
| 2024 | 4.2 | 23.8% | — |
| 2025 | 3.7 | 21.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 62289 | Solar Photovoltaic | PV | 2 | 2 | May 2023 | Operating | — | coming soon |
Owner / operator
Operator: Entegrity Solar ACC, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Entegrity Solar ACC, LLC | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| UADA | 3 MW | 0.1 km |
| Narrows (AR) | 26 MW | 28 km |
| John W Turk Jr Power Plant | 609 MW | 31.1 km |
| Fulton (AR) | 155 MW | 35.9 km |
| Ashdown | 157 MW | 39.1 km |
| Southwest Arkansas Electric | 1 MW | 48 km |