Searcy Water I
White County, Arkansas · EIA plant ID 67522 · Operator: Entegrity Solar SWU, LLC
Nameplate1MWSummer 1 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2021
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2023 | 0 | 0.0% | — |
| 2024 | 0.8 | 9.5% | — |
| 2025 | 1.8 | 21.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 69620 | Solar Photovoltaic | PV | 1 | 1 | Jun 2021 | Operating | — | coming soon |
Owner / operator
Operator: Entegrity Solar SWU, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Entegrity Solar SWU, LLC | 100.0% | 1 MW |
Nearby plants
Within 80 km.
| Searcy Solar Hybrid | 110 MW | 4.3 km |
| Searcy Water II | 3 MW | 6.5 km |
| Happy Solar 1 | 95 MW | 12 km |
| Carl Bailey | retired | 32 km |
| Woodruff County Solar | 122 MW | 34.1 km |
| SR Des Arc | — | 36.5 km |