Searcy Solar Hybrid
White County, Arkansas · EIA plant ID 62617 · Operator: Searcy Solar, LLC
Nameplate110MWSummer 110 MW
Generators2in service
Net generation171GWh12 mo to Aug 2026
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2022
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2022 | 225.2 | 25.7% | — |
| 2023 | 209.3 | 23.9% | — |
| 2024 | 206.4 | 23.5% | — |
| 2025 | 193.2 | 22.1% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| SEABT | Batteries | BA | 10 | 10 | Jan 2022 | Operating | — | coming soon |
| SEARC | Solar Photovoltaic | PV | 100 | 100 | Jan 2022 | Operating | — | coming soon |
Owner / operator
Operator: Searcy Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Searcy Solar, LLC | 100.0% | 110 MW |
Nearby plants
Within 80 km.
| Searcy Water II | 3 MW | 4 km |
| Searcy Water I | 1 MW | 4.3 km |
| Happy Solar 1 | 95 MW | 7.7 km |
| Carl Bailey | retired | 29.8 km |
| Woodruff County Solar | 122 MW | 31.9 km |
| SR Des Arc | — | 32.1 km |