← Back to map

Hornshadow Solar II, LLC

Emery County, Utah · EIA plant ID 67511 · Operator: Hornshadow Solar II, LLC
SolarSolar PhotovoltaicBA: PACE
Nameplate200MWSummer 200 MW
Generators1in service
Net generation450GWh12 mo to Aug 2026
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02040GWh2026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20252026202725.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2025227.625.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
HS2LSolar PhotovoltaicPV200200Jul 2025Operating—coming soon

Owner / operator

Operator: Hornshadow Solar II, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Hornshadow Solar II, LLC100.0%200 MW

Nearby plants

Within 80 km.
Hornshadow Solar, LLC100 MW0 km
Hunter1,472 MW4.5 km
Hunter Solar LLC (UT)100 MW7.8 km
Castle Solar, LLC40 MW16.9 km
Huntington1,016 MW23.5 km
Green River Energy Center - Hybrid800 MW23.7 km