← Back to map

Castle Solar, LLC

Emery County, Utah · EIA plant ID 64740 · Operator: Castle Solar, LLC
SolarSolar PhotovoltaicBA: PACE
Nameplate40MWSummer 40 MW
Generators1in service
Net generation107GWh12 mo to Aug 2026
Capacity factor30%solar units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0510GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%202420252026202730.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202485.632.4%—
202510830.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CSSolar PhotovoltaicPV4040Apr 2024Operating—coming soon

Owner / operator

Operator: Castle Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Castle Solar, LLC100.0%40 MW

Nearby plants

Within 80 km.
Huntington1,016 MW9 km
Hornshadow Solar, LLC100 MW16.9 km
Hornshadow Solar II, LLC200 MW16.9 km
Hunter1,472 MW18.1 km
Hunter Solar LLC (UT)100 MW22 km
Hydro Plant No 33 MW32.9 km