← Back to map

AbbVie Waco

McLennan County, Texas · EIA plant ID 67308 · Operator: generate er-ng, llc
Natural gasNatural Gas Internal Combustion EngineERCOTBA: ERCO
Nameplate6MWSummer 6 MW
Generators14in service
Net generation1GWh12 mo to Dec 2025
Capacity factor3%gas/coal/oil units, summer MW
Heat rate14,718Btu/kWhfossil units, electric fuel, HHV
First online2023Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100MWh20242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%1%2%20232024202520262.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
14,55014,60014,65014,70020242025202614,718 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202300.0%—
20240.81.7%14,572
20251.32.6%14,718

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
AB1Natural Gas Internal Combustion EngineIC0.40.4Nov 2023Operating—coming soon
AB10Natural Gas Internal Combustion EngineIC0.40.4Nov 2023Operating—coming soon
AB11Natural Gas Internal Combustion EngineIC0.40.4Nov 2023Operating—coming soon
AB12Natural Gas Internal Combustion EngineIC0.40.4Nov 2023Operating—coming soon
AB13Natural Gas Internal Combustion EngineIC0.40.4Nov 2023Operating—coming soon
AB14Natural Gas Internal Combustion EngineIC0.40.4Nov 2023Operating—coming soon
AB2Natural Gas Internal Combustion EngineIC0.40.4Nov 2023Operating—coming soon
AB3Natural Gas Internal Combustion EngineIC0.40.4Nov 2023Operating—coming soon
AB4Natural Gas Internal Combustion EngineIC0.40.4Nov 2023Operating—coming soon
AB5Natural Gas Internal Combustion EngineIC0.40.4Nov 2023Operating—coming soon
AB6Natural Gas Internal Combustion EngineIC0.40.4Nov 2023Operating—coming soon
AB7Natural Gas Internal Combustion EngineIC0.40.4Nov 2023Operating—coming soon
AB8Natural Gas Internal Combustion EngineIC0.40.4Nov 2023Operating—coming soon
AB9Natural Gas Internal Combustion EngineIC0.40.4Nov 2023Operating—coming soon

Owner / operator

Operator: generate er-ng, llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
generate er-ng, llc100.0%6 MW

Nearby plants

Within 80 km.
GPI WACO Power—1.8 km
Griffin Solar5 MW5.8 km
Tokio Solar—12.5 km
Braswell Solar—15.6 km
BPL Crown Solar LLC100 MW19.3 km
BPL Sol Solar LLC100 MW19.3 km