← Back to map

Tokio SolarPlanned

McLennan County, Texas · EIA plant ID 66397 · Operator: Gransolar Texas Eight, LLC
SolarERCOTBA: ERCO

170 MW planned (Solar Photovoltaic), first expected May 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
TOKIOSolar PhotovoltaicPV170.4168planned May 2028Planned—coming soon

Owner / operator

Operator: Gransolar Texas Eight, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
EDFR Bluebonnet10 MW10.8 km
Albatross Solar, LLC—12.3 km
Braswell Solar—12.4 km
AbbVie Waco6 MW12.5 km
GPI WACO Power—12.9 km
Eddy II10 MW15.9 km