Goose Prairie Solar

Yakima County, Washington · EIA plant ID 67261 · Operator: Goose Prairie Solar LLC
SolarSolar PhotovoltaicBA: BPAT
Nameplate80MWSummer 80 MW
Generators1in service
Net generation182GWh12 mo to Aug 2026
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01020GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202420252026202726.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20244.77.9%—
2025177.425.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GOOSESolar PhotovoltaicPV8080Dec 2024Operating—coming soon

Owner / operator

Operator: Goose Prairie Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Goose Prairie Solar LLC100.0%80 MW

Nearby plants

Within 80 km.
Ostrea Solar, LLC80 MW19.9 km
Roza13 MW20.7 km
High Top Solar—21.5 km
Drop 2 (WA)3 MW24.3 km
Drop 3 (WA)2 MW27.2 km
Priest Rapids950 MW28.4 km