High Top SolarPlanned

Yakima County, Washington · EIA plant ID 65325 · Operator: Cypress Creek Renewables
SolarBA: PACW

80 MW planned (Solar Photovoltaic), first expected Jan 2029 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
98936Solar PhotovoltaicPV8080planned Jan 2029Planned—coming soon

Owner / operator

Operator: Cypress Creek Renewables. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Ostrea Solar, LLC80 MW1.7 km
Priest Rapids950 MW14.1 km
Goose Prairie Solar80 MW21.5 km
Hop Hill Solar Generation and BESS—24.5 km
Wanapum1,220 MW38.9 km
Chandler12 MW40.1 km