← Back to map

Quail Ranch Solar and BESS

Bernalillo County, New Mexico · EIA plant ID 67204 · Operator: Quail Ranch Solar and Battery Energy Storage System
SolarBatteriesSolar PhotovoltaicBA: PNM
Nameplate200MWSummer 200 MW
Generators2in service
Net generation218GWh12 mo to Aug 2026
Capacity factor35%solar units, summer MW
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh2026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%20252026202734.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202531.542.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
QRBESBatteriesBA100100Jan 2026Operating—coming soon
QRPVSolar PhotovoltaicPV100100Dec 2025Operating—coming soon

Owner / operator

Operator: Quail Ranch Solar and Battery Energy Storage System. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Clenera LLC100.0%200 MW

Nearby plants

Within 80 km.
Atrisco Solar LLC300 MW1.2 km
City of Rio Rancho WWTP1 MW5 km
Atrisco Energy Storage300 MW5.1 km
ASG-2 Community Solar5 MW6.1 km
TAG198 MW8.1 km
Sandoval Solar Energy Center6 MW10.2 km