Bernalillo County, New Mexico · EIA plant ID 67003 · Operator: Atrisco Solar LLC
Nameplate300MWSummer 300 MW
Generators1in service
Net generation754GWh12 mo to Aug 2026
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2024
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2024 | 118 | 17.8% | — |
| 2025 | 717.7 | 27.3% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| ATRPV | Solar Photovoltaic | PV | 300 | 300 | Oct 2024 | Operating | — | coming soon |
Owner / operator
Operator: Atrisco Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Clenera LLC | 100.0% | 300 MW |
Nearby plants
Within 80 km.
| Quail Ranch Solar and BESS | 200 MW | 1.2 km |
| Atrisco Energy Storage | 300 MW | 4.8 km |
| City of Rio Rancho WWTP | 1 MW | 5 km |
| ASG-2 Community Solar | 5 MW | 7.2 km |
| TAG | 198 MW | 9.2 km |
| Sandoval Solar Energy Center | 6 MW | 11.4 km |