← Back to map

Atrisco Solar LLC

Bernalillo County, New Mexico · EIA plant ID 67003 · Operator: Atrisco Solar LLC
SolarSolar PhotovoltaicBA: PNM
Nameplate300MWSummer 300 MW
Generators1in service
Net generation754GWh12 mo to Aug 2026
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202420252026202728.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202411817.8%—
2025717.727.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ATRPVSolar PhotovoltaicPV300300Oct 2024Operating—coming soon

Owner / operator

Operator: Atrisco Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Clenera LLC100.0%300 MW

Nearby plants

Within 80 km.
Quail Ranch Solar and BESS200 MW1.2 km
Atrisco Energy Storage300 MW4.8 km
City of Rio Rancho WWTP1 MW5 km
ASG-2 Community Solar5 MW7.2 km
TAG198 MW9.2 km
Sandoval Solar Energy Center6 MW11.4 km