Anticline Wind

Natrona County, Wyoming · EIA plant ID 67193 · Operator: Anticline Wind, LLC
WindOnshore Wind TurbineBA: WACM
Nameplate124MWSummer 124 MW
Generators1in service
Net generation425GWh12 mo to Aug 2026
Capacity factor39%wind units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02040GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%202420252026202739.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202416.617.9%—
2025386.935.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ACOnshore Wind TurbineWT124.3124.3Dec 2024Operating—ge 3.4-140

Owner / operator

Operator: Anticline Wind, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Anticline Wind, LLC100.0%124 MW

Nearby plants

Within 80 km.
Casper Wind Farm17 MW30.8 km
Campbell Hill Windpower99 MW31.8 km
Rolling Hills116 MW41.2 km
Glenrock166 MW43.9 km
Top of the World Windpower Project200 MW51.7 km
Cedar Springs Wind IV390 MW51.8 km