← Back to map

Chihuahuan Desert Solar

El Paso County, Texas · EIA plant ID 67174 · Operator: El Paso Electric Co
SolarSolar PhotovoltaicBA: EPE
Nameplate10MWSummer 10 MW
Generators1in service
Net generation27GWh12 mo to Dec 2025
Capacity factor46%solar units, summer MW
Heat rate—thermal plants only
First online2025

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0123GWh2025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2025202646.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202527.246.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
10TXCSolar PhotovoltaicPV1010May 2025Operating—coming soon

Owner / operator

Operator: El Paso Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
El Paso Electric Co100.0%10 MW

Nearby plants

Within 80 km.
Evlou Solar, LLC—20.3 km
Felina153 MW21 km
Copper87 MW24.5 km
Phelps Dodge Refining20 MW25.9 km
Montana Solar Facility3 MW28.3 km
TJX 2021 DG El Paso DC2 MW28.5 km