← Back to map

Fagus Solar Park

Childress County, Texas · EIA plant ID 67123 · Operator: Excel Advantage Services, LLC
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate332MWSummer 332 MW
Generators1in service
Net generation429GWh12 mo to Aug 2026
Capacity factor35%solar units, summer MW
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2026202735.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MISIISolar PhotovoltaicPV331.6331.6Dec 2025Operating—coming soon

Owner / operator

Operator: Excel Advantage Services, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Excel Advantage Services, LLC100.0%332 MW

Nearby plants

Within 80 km.
Misae Solar240 MW5.7 km
Lazy U Solar 1—18.8 km
Lazy U ESS 2—18.8 km
Lazy U Solar 2—18.8 km
Lazy U ESS 1—18.8 km
Blue Summit III Wind200 MW49 km