Misae Solar

Childress County, Texas · EIA plant ID 62249 · Operator: Misae Lessee LLC
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate240MWSummer 240 MW
Generators1in service
Net generation413GWh12 mo to Aug 2026
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2020

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh2020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2020202120222023202420252026202719.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2020477.822.7%—
2021473.822.5%—
2022521.524.8%—
2023527.125.1%—
2024455.321.6%—
2025408.919.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
77777Solar PhotovoltaicPV240240Jan 2020Operating—coming soon

Owner / operator

Operator: Misae Lessee LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Childress Solar Park LLC100.0%240 MW

Nearby plants

Within 80 km.
Fagus Solar Park332 MW5.7 km
Lazy U Solar 1—24.5 km
Lazy U ESS 2—24.5 km
Lazy U Solar 2—24.5 km
Lazy U ESS 1—24.5 km
Blue Summit III Wind200 MW54.5 km