← Back to map

Quarter Ranch SolarPlanned

Webb County, Texas · EIA plant ID 67078 · Operator: Gransolar Texas Three, LLC
SolarERCOTBA: ERCO

154 MW planned (Solar Photovoltaic), first expected Oct 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GRS3Solar PhotovoltaicPV154.1154planned Oct 2028Planned—coming soon

Owner / operator

Operator: Gransolar Texas Three, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Bravo ESS—2.6 km
Seven Flags BESS LLC100 MW17.3 km
Reloj del Sol Wind Farm209 MW30.4 km
Laredo264 MW30.5 km
Wolf Tank Storage150 MW34.3 km
HEB000952 MW34.3 km