Reloj del Sol Wind Farm
Zapata County, Texas · EIA plant ID 62207 · Operator: Reloj del Sol Wind Farm LLC
Nameplate209MWSummer 209 MW
Generators1in service
Net generation583GWh12 mo to Aug 2026
Capacity factor32%wind units, summer MW
Heat rate—thermal plants only
First online2021
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2021 | 449.2 | 36.5% | — |
| 2022 | 319.9 | 17.4% | — |
| 2023 | 239.2 | 13.0% | — |
| 2024 | 308.3 | 16.8% | — |
| 2025 | 592.3 | 32.3% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| RELOJ | Onshore Wind Turbine | WT | 209.4 | 209.4 | May 2021 | Operating | — | acciona AW132/3000 |
Owner / operator
Operator: Reloj del Sol Wind Farm LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Reloj del Sol Wind Farm LLC | 100.0% | 209 MW |
Nearby plants
Within 80 km.
| Zapata | 20 MW | 18.8 km |
| Bravo ESS | — | 28.4 km |
| Quarter Ranch Solar | — | 30.4 km |
| Lopeno | 10 MW | 47.1 km |
| Seven Flags BESS LLC | 100 MW | 47.4 km |
| Las Lomas Wind Project | 202 MW | 49.4 km |