SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate242MWSummer 242 MW
Generators2in service
Net generation404GWh12 mo to Aug 2026
Capacity factor31%solar units, summer MW
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02040GWh2026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20252026202731.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2025207.831.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
NO1Solar PhotovoltaicPV150150Jul 2025Operating—coming soon
NOBATBatteriesBA9292Jul 2025Operating—coming soon

Owner / operator

Operator: RWE Clean Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
RWE Clean Energy100.0%242 MW

Nearby plants

Within 80 km.
Algonquin SKIC 10 Solar, LLC10 MW3.3 km
Algonquin SKIC20 Solar LLC20 MW3.3 km
Maricopa West Solar PV, LLC20 MW3.6 km
Wheeler Ridge5 MW5.4 km
Vulcan San Emidio Solar1 MW11.9 km
Cawelo Water District Solar3 MW11.9 km