CPV Stagecoach Solar

Macon County, Georgia · EIA plant ID 67021 · Operator: CPV Stagecoach Solar, LLC
SolarSolar PhotovoltaicBA: SOCO
Nameplate80MWSummer 80 MW
Generators1in service
Net generation170GWh12 mo to Aug 2026
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
05101520GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202420252026202724.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2024117.725.0%—
2025170.124.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SC1Solar PhotovoltaicPV8080May 2024Operating—coming soon

Owner / operator

Operator: CPV Stagecoach Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
CPV Stagecoach Solar, LLC100.0%80 MW

Nearby plants

Within 80 km.
Flint River Operations77 MW6.3 km
Freeman Avenue1 MW7.6 km
Brenneman Solar Project—11.8 km
Brady Solar LLC2 MW20.2 km
SR DeSoto I, LLC165 MW34.9 km
SR Perry68 MW36.3 km