← Back to map

Gateway BESSRetired

Kings County, New York · EIA plant ID 66967 · Operator: Enel X North America, Inc
BatteryNYISOBA: NYIS

×5 MW battery retired since 2020 (latest Aug 2024)

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.20.40.60.81MWh2024

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20240——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
S049BatteriesBA4.84.8May 2019Retired Aug 2024—coming soon

Owner / operator

Operator: Enel X North America, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Brownsville Energy Storage System6 MW3 km
Blue Aster B Clean Energy LLC—3.5 km
Blue Aster C Clean Energy LLC—3.5 km
Blue Aster Clean Energy LLC—3.5 km
98th Street Battery Storage Station2 MW3.9 km
Jamaica Community Energy, LLC—5.1 km