Blue Aster Clean Energy LLCUnder construction

Kings County, New York · EIA plant ID 70308 · Operator: NineDot Holdings, LLC
BatteryNYISOBA: NYIS

5 MW under construction (Batteries), first expected Aug 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 5 MW building
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ND030BatteriesBA4.94.9planned Aug 2027Under construction—coming soon

Owner / operator

Operator: NineDot Holdings, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Blue Aster B Clean Energy LLC—0 km
Blue Aster C Clean Energy LLC—0 km
Brownsville Energy Storage System6 MW0.6 km
Interfaith Medical Center1 MW3.1 km
Kingsbrook Jewish Medical Center3 MW3.2 km
The Bank of New York7 MW3.2 km