← Back to map

Prescott Wind Farm

Adams County, Iowa · EIA plant ID 66952 · Operator: Prescott Wind Energy LLC
WindOnshore Wind TurbineMISOBA: MISO
Nameplate39MWSummer 56 MW
Generators1in service
Net generation170GWh12 mo to Aug 2026
Capacity factor35%wind units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
05101520GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%202420252026202734.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202451.945.8%—
2025141.841.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PWEOnshore Wind TurbineWT38.755.9Sep 2024Operating—vestas V150-4.2

Owner / operator

Operator: Prescott Wind Energy LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Prescott Wind Energy LLC100.0%39 MW

Nearby plants

Within 80 km.
Southern Hills Wind Farm254 MW11.6 km
Rolling Hills Wind Farm484 MW16.5 km
Bulldog2 MW18 km
Orient Wind Farm501 MW18.2 km
Corning7 MW18.5 km
Cumberland Rose2 MW18.5 km