← Back to map

Orient Wind Farm

Adair County, Iowa · EIA plant ID 61077 · Operator: MidAmerican Energy Co
WindOnshore Wind TurbineMISOBA: MISO
Nameplate501MWSummer 500 MW
Generators2in service
Net generation1,799GWh12 mo to Aug 2026
Capacity factor41%wind units, summer MW
Heat rate—thermal plants only
First online2018

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150200GWh20192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%20192020202120222023202420252026202741.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2019683.857.5%—
20201,704.138.7%—
20211,848.542.1%—
20222,140.548.9%—
20231,740.539.7%—
20241,80641.1%—
20251,819.841.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Onshore Wind TurbineWT102100Dec 2018Operating—vestas V110-2.0
2Onshore Wind TurbineWT398.8400Dec 2019Operating—vestas V110-2.0

Owner / operator

Operator: MidAmerican Energy Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
MidAmerican Energy Co100.0%501 MW

Nearby plants

Within 80 km.
Cumberland Rose2 MW3.1 km
Bulldog2 MW3.3 km
Southern Hills Wind Farm254 MW10.9 km
Greenfield Wind2 MW11.3 km
Sky Volt2 MW11.3 km
Summit Lake119 MW11.5 km