Baldy Mesa 2_Silver Peak Hybrid

San Bernardino County, California · EIA plant ID 66885 · Operator: aes clean energy
SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate75MWSummer 75 MW
Generators2in service
Net generation112GWh12 mo to Aug 2026
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%202420252026202725.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202400.0%—
2025118.729.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SPKBSBatteriesBA2525Dec 2024Operating—coming soon
SPKPVSolar PhotovoltaicPV5050Dec 2024Operating—coming soon

Owner / operator

Operator: aes clean energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
aes clean energy100.0%75 MW

Nearby plants

Within 80 km.
Baldy Mesa Solar & Storage225 MW0.1 km
Baldy Mesa Storage—0.8 km
Industry Solar Power Generation Station 1 LLC2 MW6.2 km
Adelanto Solar Project7 MW6.7 km
Coronus Adelanto West 12 MW6.9 km
Coronus Adelanto West 22 MW6.9 km