← Back to map

FreeState Crooked Post Solar I

Shawnee County, Kansas · EIA plant ID 66883 · Operator: Westar Energy Inc
SolarSolar PhotovoltaicSPPBA: SWPP
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2023

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202320242025202623.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20233.429.2%—
20243.625.7%—
20253.423.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
FCS1Solar PhotovoltaicPV1.61.6Mar 2023Operating—coming soon

Owner / operator

Operator: Westar Energy Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Westar Energy Inc100.0%2 MW

Nearby plants

Within 80 km.
FreeState Kiro Solar I1 MW13.1 km
Waste Management Rolling Meadows LFGTE6 MW21.4 km
Burlingame4 MW26.6 km
FreeState Stull Solar I1 MW33.5 km
Osage City Solar2 MW38.1 km