← Back to map

FreeState Kiro Solar I

Shawnee County, Kansas · EIA plant ID 66882 · Operator: Westar Energy Inc
SolarSolar PhotovoltaicSPPBA: SWPP
Nameplate1MWSummer 1 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor25%solar units, summer MW
Heat rate—thermal plants only
First online2023

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200MWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202320242025202624.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20232.227.5%—
20242.326.5%—
20252.224.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
FKS1Solar PhotovoltaicPV11Feb 2023Operating—coming soon

Owner / operator

Operator: Westar Energy Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Westar Energy Inc100.0%1 MW

Nearby plants

Within 80 km.
Waste Management Rolling Meadows LFGTE6 MW8.7 km
FreeState Crooked Post Solar I2 MW13.1 km
FreeState Stull Solar I1 MW33.7 km
Jeffrey Energy Center2,160 MW34.7 km
Burlingame4 MW39.6 km
Oskaloosa1 MW39.8 km