← Back to map

KCE CT 1, LLCPlanned

Windham County, Connecticut · EIA plant ID 66879 · Operator: Key Capture Energy
BatteryISONEBA: ISNE

45 MW planned (Batteries), first expected Apr 2031 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CT1BatteriesBA4545planned Apr 2031Planned—coming soon

Owner / operator

Operator: Key Capture Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Lake Road Generating Plant840 MW1.2 km
Frito Lay Incorporated5 MW2.2 km
Putnam Meadow Solar Station—2.6 km
Woods Hill Solar20 MW6 km
Woodstock Solar One3 MW7.1 km
Barrett Farm Solar - Phase I2 MW7.1 km