Barrett Farm Solar - Phase I
Windham County, Connecticut · EIA plant ID 61728 · Operator: A2-A Pearl Investments LLC
Nameplate2MWSummer 1 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2017
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2017 | 0.2 | 3.0% | — |
| 2018 | 2.5 | 11.8% | — |
| 2019 | 2.7 | 12.9% | — |
| 2020 | 2.8 | 13.4% | — |
| 2021 | 2.6 | 12.6% | — |
| 2022 | 2.9 | 27.6% | — |
| 2023 | 2.9 | 27.3% | — |
| 2024 | 2.7 | 25.4% | — |
| 2025 | 2.5 | 23.9% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 10263 | Solar Photovoltaic | PV | 1.7 | 1.2 | Oct 2017 | Operating | — | coming soon |
Owner / operator
Operator: A2-A Pearl Investments LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Janus Solar Fund LP | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Putnam Meadow Solar Station | — | 5.4 km |
| Woodstock Solar One | 3 MW | 6.9 km |
| KCE CT 1, LLC | — | 7.1 km |
| Lake Road Generating Plant | 840 MW | 8.3 km |
| Frito Lay Incorporated | 5 MW | 9.3 km |
| Webster Solar | 1 MW | 9.5 km |