← Back to map

GulfStar Power, LLC

Wharton County, Texas · EIA plant ID 66871 · Operator: GulfStar Power, LLC
BatteryBatteriesERCOTBA: ERCO

452 MW under construction (Solar Photovoltaic), first expected Oct 2026 · EIA-860M

Nameplate300MWSummer 300 MW
Generators1in service · 452 MW building
Net generation896GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0255075100GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2025822.8——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BESSBatteriesBA300300Jun 2025Operating—coming soon
SOLARSolar PhotovoltaicPV451.6451.6planned Oct 2026Under construction—coming soon

Owner / operator

Operator: GulfStar Power, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
GulfStar Power, LLC100.0%300 MW

Nearby plants

Within 80 km.
Pledger—5.4 km
Erin—5.4 km
Cascade Solar (TX)10 MW5.6 km
Lane City Wind203 MW6.4 km
OCI SunRoper—6.9 km
Newgulf Cogen102 MW10.4 km