← Back to map

OCI SunRoperPlanned

Wharton County, Texas · EIA plant ID 65893 · Operator: OCI Solar Power
BatteryERCOTBA: ERCO

260 MW planned (Solar Photovoltaic), first expected Dec 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
OCIROSolar PhotovoltaicPV260260planned Dec 2027Planned—coming soon

Owner / operator

Operator: OCI Solar Power. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Lane City Wind203 MW3.8 km
Cascade Solar (TX)10 MW4.1 km
GulfStar Power, LLC300 MW6.9 km
Colorado Bend II1,230 MW7.6 km
Colorado Bend Energy Center654 MW7.6 km
Erin—8.6 km