Egypt Road Solar
Dorchester County, Maryland · EIA plant ID 66840 · Operator: Urban Grid Solar
Nameplate51MWSummer 51 MW
Generators1in service
Net generation75GWh12 mo to Aug 2026
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2025
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2025 | 0.7 | 1.8% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| EGYR1 | Solar Photovoltaic | PV | 51.1 | 51.1 | Dec 2025 | Operating | — | coming soon |
Owner / operator
Operator: Urban Grid Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Urban Grid Solar | 100.0% | 51 MW |
Nearby plants
Within 80 km.
| Mustang One | 2 MW | 4.1 km |
| UMCES Ground Mount | 2 MW | 6.5 km |
| CNE at Cambridge MD | 3 MW | 7.3 km |
| Cabin Creek MD | 2 MW | 20.1 km |
| Richfield Solar Energy LLC | 50 MW | 22 km |
| Vienna Operations | 181 MW | 24.8 km |