← Back to map

Estrella Solar & Storage

Los Angeles County, California · EIA plant ID 66772 · Operator: aes clean energy
SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate84MWSummer 84 MW
Generators2in service
Net generation155GWh12 mo to Aug 2026
Capacity factor33%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-5051015GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2023202420252026202732.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20230.51.3%—
2024114.223.9%—
2025153.332.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ESPVSolar PhotovoltaicPV5656Dec 2023Operating—coming soon
ESTRBBatteriesBA2828Dec 2023Operating—coming soon

Owner / operator

Operator: aes clean energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
aes clean energy100.0%84 MW

Nearby plants

Within 80 km.
Rabbitbrush Solar, LLC120 MW2.5 km
Willow Spring Solar, LLC108 MW2.7 km
Catalina Solar 2, LLC18 MW3.3 km
Tumbleweed Energy Storage125 MW3.6 km
Raceway Solar & Storage205 MW4.7 km
Solar Star 2279 MW5.6 km