← Back to map

Catalina Solar 2, LLC

Kern County, California · EIA plant ID 59334 · Operator: Novatus Energy
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate18MWSummer 18 MW
Generators1in service
Net generation55GWh12 mo to Dec 2025
Capacity factor35%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202635.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201523.735.9%—
201656.535.7%—
201755.435.1%—
20185635.5%—
201952.433.3%—
202048.230.5%—
202148.230.6%—
202246.829.7%—
20234528.5%—
202452.833.4%—
202555.435.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
INV-1Solar PhotovoltaicPV1818Aug 2015Operating—coming soon

Owner / operator

Operator: Novatus Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Novatus Energy100.0%18 MW

Nearby plants

Within 80 km.
Willow Spring Solar, LLC108 MW2.3 km
Tumbleweed Energy Storage125 MW2.8 km
Estrella Solar & Storage84 MW3.3 km
Rabbitbrush Solar, LLC120 MW3.6 km
Solar Star 2279 MW4 km
Rosamond South 1257 MW4.1 km