Whale Rock Pumped Storage Hydro ProjectPlanned

San Luis Obispo County, California · EIA plant ID 66685 · Operator: Premium Energy Holdings
HydroCAISOBA: CISO

600 MW planned (Hydroelectric Pumped Storage), first expected Jul 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WH001Hydroelectric Pumped StoragePS200200planned Jul 2027Planned—coming soon
WH002Hydroelectric Pumped StoragePS200200planned Jul 2027Planned—coming soon
WH003Hydroelectric Pumped StoragePS200200planned Jul 2027Planned—coming soon

Owner / operator

Operator: Premium Energy Holdings. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Camp San Luis Obispo1 MW19.1 km
Vintner Solar2 MW20.3 km
Atascadero State Hospital1 MW21.1 km
CA-DGS-California Men's Colony2 MW21.3 km
Stenner Creek Solar5 MW21.8 km
Firestone Walker Brewery - Phase 12 MW22.2 km