Camp San Luis Obispo

San Luis Obispo County, California · EIA plant ID 63870 · Operator: Ecoplexus, Inc
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2024

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200MWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20242025202622.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20220——
20230——
20240.23.6%—
20252.422.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CPSLOSolar PhotovoltaicPV1.21.2Aug 2024Operating—coming soon

Owner / operator

Operator: Ecoplexus, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Ecoplexus, Inc100.0%1 MW

Nearby plants

Within 80 km.
CA-DGS-California Men's Colony2 MW3.5 km
Stenner Creek Solar5 MW3.8 km
Diablo Canyon2,323 MW16.6 km
Atascadero State Hospital1 MW18.1 km
Thomas M Knott Cogen Facility1 MW18.5 km
Whale Rock Pumped Storage Hydro Project—19.1 km