Bulldog Solar LLC

Warren County, Georgia · EIA plant ID 66542 · Operator: Bulldog Solar LLC
SolarSolar PhotovoltaicBA: SOCO
Nameplate80MWSummer 80 MW
Generators1in service
Net generation157GWh12 mo to Aug 2026
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2023202420252026202722.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2023108.223.0%—
2024158.222.5%—
2025171.324.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PGR37Solar PhotovoltaicPV8080May 2023Operating—coming soon

Owner / operator

Operator: Bulldog Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Bulldog Solar LLC100.0%80 MW

Nearby plants

Within 80 km.
SR Norwood—10.7 km
Rock House Solar—26.8 km
AL Sandersville LLC692 MW32.8 km
Drawhorn Solar—38.1 km
Columbia Substation2 MW41.4 km
Washington County Power LLC796 MW41.8 km