Shamrock Wind

Crockett County, Texas · EIA plant ID 66540 · Operator: Shamrock Wind LLC
WindBatteriesOnshore Wind TurbineERCOTBA: ERCO
Nameplate324MWSummer 324 MW
Generators2in service
Net generation859GWh12 mo to Aug 2026
Capacity factor45%wind units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2023202420252026202744.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202323.113.9%—
2024857.143.6%—
2025866.545.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SESBatteriesBA100100Jan 2025Operating—coming soon
WSHAMOnshore Wind TurbineWT223.9223.9Dec 2023Operating—ge 2.82-127

Owner / operator

Operator: Shamrock Wind LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Shamrock Wind LLC100.0%324 MW

Nearby plants

Within 80 km.
Big Sampson Wind—23.8 km
Russek10 MW30.9 km
Appaloosa Run Wind172 MW32.6 km
White Mesa Wind501 MW32.9 km
Gatsby Energy Storage Project—34.5 km
High Lonesome Wind Power, LLC Hybrid563 MW37 km