Cole County, Missouri · EIA plant ID 6652 · Operator: Union Electric Co - (MO)
OilPetroleum LiquidsMISOBA: MISO
Nameplate61MWSummer 54 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate13,418Btu/kWhfossil units, electric fuel, HHV
First online1978Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-0.500.51GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%1%1%200520102015202020250.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00015,00020,00025,00030,0002005201020152020202513,418 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20011.80.4%18,812
20021.20.3%16,596
20031.10.2%18,463
20041.20.3%18,149
20050.20.0%—
20060.30.1%16,925
2007-0.3-0.1%—
200800.0%—
2009-0.1-0.0%—
2010-0.4-0.1%—
2011-0.2-0.0%—
20120.60.1%23,103
2013-0.2-0.0%—
2014-0-0.0%—
2015-0.4-0.1%—
2016-0.1-0.0%—
2017-0.2-0.0%—
20180.30.1%—
20191.70.4%12,551
20200.30.1%28,381
20214.40.9%12,551
20222.10.4%12,361
202300.0%—
202410.2%14,374
20251.70.4%13,418

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Petroleum LiquidsGT60.854Aug 1978Operating—coming soon

Owner / operator

Operator: Union Electric Co - (MO). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Union Electric Co - (MO)100.0%61 MW

Nearby plants

Within 80 km.
Ameresco Jefferson City3 MW5 km
Fairgrounds68 MW11.1 km
Callaway1,236 MW36 km
Fulton Energy Center—37.2 km
Fulton (MO)33 MW37.2 km
Truman Solar10 MW46.2 km