← Back to map

Fulton (MO)

Callaway County, Missouri · EIA plant ID 2126 · Operator: City of Fulton - (MO)
Natural gasNatural Gas Fired Combustion TurbinePetroleum LiquidsBA: AECI
Nameplate33MWSummer 25 MW
Generators3in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate20,932Btu/kWhfossil units, electric fuel, HHV
First online1966Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150200MWh200120032005200720092012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%0%1%1%200520102015202020250.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
5,00010,00015,00020,00025,0002005201020152020202520,932 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20010.4——
20020.8——
20030.60.2%20,012
20040.60.2%—
20050.40.2%20,022
20060.40.1%11,754
20070.40.2%21,042
20080.40.1%—
20090.40.2%—
20110.20.1%18,656
20120.30.1%18,356
20131.90.8%17,101
20140.40.2%18,092
20150.10.0%18,855
20160.30.1%19,989
20170.30.1%26,952
201810.4%26,098
20190.20.1%21,722
20200.30.1%19,578
20210.30.1%22,904
20221.20.5%19,317
20230.20.1%20,937
20240.20.1%20,957
20250.30.1%20,932

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusListed in EIA-860, no liquid burn in 36 months
Liquid fuel burned · 36 mo0 MMBtu
Last month with liquid burn—
Switch while operatingYes
Net summer MW on gas15
Net summer MW on oil15
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GT4Natural Gas Fired Combustion TurbineGT21.215Aug 1972Operating—coming soon
IC1Petroleum LiquidsIC54.1Sep 1966Operating—coming soon
IC3Petroleum LiquidsIC76.2May 1975Operating—coming soon
IC2Petroleum LiquidsIC54.1Oct 1966Retired May 2012—coming soon

Owner / operator

Operator: City of Fulton - (MO). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
City of Fulton - (MO)100.0%33 MW

Nearby plants

Within 80 km.
Fulton Energy Center—0.1 km
Show Me State Solar—10.1 km
Callaway1,236 MW19 km
Truman Solar10 MW27.3 km
Columbia Energy Center163 MW32 km
Mexico61 MW32.7 km