West Tambo Clean Power II

Merced County, California · EIA plant ID 66506 · Operator: West Tambo Clean Power II
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2024

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400MWh20242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20242025202624.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20240.929.9%—
20254.324.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WEST2Solar PhotovoltaicPV22Nov 2024Operating—coming soon

Owner / operator

Operator: West Tambo Clean Power II. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
West Tambo Clean Power II100.0%2 MW

Nearby plants

Within 80 km.
City of Atwater NEM2 MW12.5 km
2097 Helton Solar Project2 MW18.8 km
Walnut Energy Center301 MW21 km
Walnut50 MW21.8 km
Merced Solar LLC2 MW23.2 km
Mission Solar LLC2 MW23.4 km