CA Jurupa Valley 3251 De Forest Circle
Riverside County, California · EIA plant ID 66476 · Operator: Catalyze Mira Loma 3251 De Forest Circle Microgrid LLC
Nameplate5MWSummer 5 MW
Generators1in service
Net generation8GWh12 mo to Dec 2025
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2024
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2023 | 0 | — | — |
| 2024 | 4.7 | 15.8% | — |
| 2025 | 8.5 | 21.5% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 18268 | Solar Photovoltaic | PV | 4.5 | 4.5 | Apr 2024 | Operating | — | coming soon |
Owner / operator
Operator: Catalyze Mira Loma 3251 De Forest Circle Microgrid LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Catalyze Mira Loma 3251 De Forest Circle Microgrid LLC | 100.0% | 5 MW |
Nearby plants
Within 80 km.
| Dulles | 2 MW | 0.5 km |
| SunE- E Philadelphia Ontario | 1 MW | 1.5 km |
| Oltmans SCE at Champagne | 1 MW | 2.1 km |
| Mira Loma | 3 MW | 2.1 km |
| New-Indy Ontario Mill | 33 MW | 2.7 km |
| Chambers 4 - Eastvale LGB3 | 2 MW | 4.3 km |