← Back to map

San Manuel Central Plant Cogens

San Bernardino County, California · EIA plant ID 66472 · Operator: San Manuel Mission Band of Indians
Natural gasNatural Gas Internal Combustion EngineCAISOBA: CISO
Nameplate5MWSummer 5 MW
Generators2in service
Net generation18GWh12 mo to Dec 2025
Capacity factor41%gas/coal/oil units, summer MW
Heat rate10,017Btu/kWhfossil units, electric fuel, HHV
First online2021Runs as baseload

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0123GWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2022202320242025202641.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
7,0008,0009,00010,000202320242025202610,017 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202200.0%—
202326.560.6%10,212
202427.262.0%8,114
20251841.2%10,017

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CGEN1Natural Gas Internal Combustion EngineIC2.72.5Jun 2021Operating—coming soon
CGEN2Natural Gas Internal Combustion EngineIC2.72.5Jun 2021Operating—coming soon

Owner / operator

Operator: San Manuel Mission Band of Indians. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
San Manuel Mission Band of Indians100.0%5 MW

Nearby plants

Within 80 km.
Waterman Turnout Hydroelectric1 MW5 km
IGS KSBD4 MW5.1 km
RPUWD Scheuer Well Solar Project3 MW5.9 km
Amazon San Bernardinoretired7.1 km
Kohls San Bernardino Solar Facility1 MW7.1 km
Solar Photovoltaic Project #05retired7.2 km