RPUWD Scheuer Well Solar Project
San Bernardino County, California · EIA plant ID 61824 · Operator: GSRP
Nameplate3MWSummer 3 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor6%solar units, summer MW
Heat rate—thermal plants only
First online2018
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2018 | 5.8 | 37.7% | — |
| 2019 | 3.2 | 12.2% | — |
| 2020 | 3.2 | 12.1% | — |
| 2021 | 6.7 | 25.6% | — |
| 2022 | 6 | 22.8% | — |
| 2023 | 4.2 | 15.8% | — |
| 2024 | 0 | 0.0% | — |
| 2025 | 1.5 | 5.5% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| RPU2 | Solar Photovoltaic | PV | 3 | 3 | Jun 2018 | Operating | — | coming soon |
Owner / operator
Operator: GSRP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| SunTrust Equipment Finance & Leasing Corp | 100.0% | 3 MW |
Nearby plants
Within 80 km.
| Kohls San Bernardino Solar Facility | 1 MW | 2 km |
| IGS KSBD | 4 MW | 3.6 km |
| Amazon San Bernardino | retired | 3.6 km |
| Chambers 4 - San Bernardino SNA7 | 2 MW | 3.8 km |
| SB Water Reclamation Fuel Cell | 1 MW | 4.2 km |
| IGS SBD2 | 3 MW | 4.3 km |